close-up-solar-panel

OUTSTANDING SUSTAINABLE PROJECT FINANCING

31 January 2022 / By Othman
8 MW

Project Name/Title: Kompleks Hijau Solar: 8MW Solar Photovoltaic Farm

Project Type: Solar PV power generation plant and related infra- structure


Brief Description of the Project

The project consist of an 8 MW capacity solar photovoltaic power generation plant, a 2-storey administrative and monitoring centre building,  access and parameter roads  come with drainage systems and 5 km underground cabling works to a utility(electricity) sub-station.

This project is a Renewable Energy (Solar Photovoltaic) Power generation plant licensed under the Feed-in Tariff (FiT) mechanism of the Malaysian Renewable Energy Act 2011

Key Points of the Project:

  1. 8 MW solar farm and 2-storey building land area:  14.16 acres
  2. Number of solar panels: 29,092 units solar mono –crystalline type
  3. Date of Project Approval by Local Authority:  15 August 2013
  4. Date of Project Commencement : 1 October  2013
  5. Date of Completion of Construction: 31 October 2013
  6. Initial Operations Date of Solar PV power plant: 11 December 2014
  7. Feed-in Tariff Commencement date (after full  testing & commissioning) :  23 December 2014.

Prior to commencement of construction works,  a  Renewable Energy Power Purchase Agreement (REPPA) was signed between the owner/developer; Gading Kencana Sdn Bhd  and the National Utility company ; Tenaga Nasional Berhad (TNB).  This agreement ensures the purchase of power (electricity) generated by the solar plant by the TNB for a duration of 21 years (ending 22 December 2035) and maybe extended for a further period on mutual consent by both parties.


Innovation: Details of Innovative Features of the Project

The contour of the land where the project is located was “bowl – shaped “ if a cross section is made.  The developer had to re-design the contour of the  site  by filling up the 30 meter deep valley, raising the altitude of the site to 43 meters above sea level.  The innovation of the landscape allows controlled flow of rain water to be channelled into a retention pond; preventing soil erosion and water ponding (which can lead to breeding of mosquitoes)

The available land size for the placing of the solar panels is very much smaller than the world’s average size for solar farm required which is 1 MW to 5 acres of land.  On calculation, this developer only has a ratio of 1MW to 1.5 acres of land.  Innovative design of  the system, arrangement of solar panels and placing of solar inverters made it possible for this to be achieved.  Weather data, sun path data, wind and rain data were used to simulate the arrangement so that shadow casting on the solar panels’ surfaces are reduced to near zero level.  Any shadow casted on solar panel surfaces is not only harmful to the solar panels’ well- being , it would also reduce its efficiency to generate electricity.

8 MW solar farm8 MW solar farm

Most solar farms in the world are built on land surfaces which are flat; naturally or earthworks are carried out to make the land surface flat.  For this solar farm, the developer has designed the surface to control flow of rain water to a retention pond through a network of drainage systems.  The land surface slopes 10 degrees downward from 6 directions to the retention pond.

Most solar farms in the world are built on land surfaces which are flat; naturally or earthworks are carried out to make the land surface flat.  For this solar farm, the developer has designed the surface to control flow of rain water to a retention pond through a network of drainage systems.  The land surface slopes 10 degrees downward from 6 directions to the retention pond.

8 MW solar farm

The A shaped mounting of solar panels saves land use area

The innovation resulted in savings on the costs of the project as follows:

    • Land use savings by 58% totalling up to RM900,000/MW
    • Balance of systems reduction by 10% amounting to RM250,000

During the Defect Liability period of 1 year, the solar farm has produced a 13% higher yield compared to what has been forecasted (using conventional design)  With the innovative design, the solar farm produces 11,510 MWh electricity per year as compared to the forecasted 10,120MWh.  Hence after negotiations with the authorities,  the developer is able to sell more to the  utility grid, increasing its yearly revenue.

Unlike other solar photovoltaic power generation plant, the developer has built facilities in the monitoring and control building for visitor briefing, training and seminars.  It even provides space for future solar exhibits to educate visitors on the technology.  The  said building is also built to achieve a Silver Certification under the Malaysian Green Building  Index.


The Contribution of the Project to Environmental Dimension of Sustainable Development

It is said that solar panels does add to carbon footprint to purchase a few solar panels, as solar panels manufacturing does add something to greenhouse gases. However, solar panels pay for themselves in just a few short years. In less than two year, solar panels are carbon negative, as the savings makes up for what it added to the atmosphere upon its creation. According to Home Power magazine, manufacturing a 100-watt solar panel produces about 960 pounds of CO2. But, in the 20-25 year life span of that solar panel, the offset is around 8,400 pounds of CO2.

For the 8 MW solar farm  project the total carbon reduction is 136,729 tonnes.

The  control and monitoring building uses bio-bricks made from 94% recycled materials and 100% regional materials.  Recycle bins are placed at the building for collection of waste paper, plastic and glass.  This building was installed with rainwater  harvesting system with a 6,000 litres storage tank.  This represent a 39% potable water reduction for irrigation.

A 40KWp solar photovoltaic system was also installed on the roof of the building to generate green energy for the use of the building.  The yield from this system is 51,400kWh/year.  This represents 75% of the total building energy consumption per year.

A total of 414 trees were planted in the project grounds (254 units Tecoma trees , 150 units Kelat Paya  trees and 10 palm trees).

The trees were planted for cooling, soil erosion control and CO2 absorption. 1 tree seedling grown for 10 years ± 0.039 metric tons CO2 absorption.  Therefore 414 trees grown for 20 years will absorb 31,512 tonnes CO2.


The Contribution of the Project to the Social Dimension of Sustainable Development

During the construction of the solar farm project 50 school leavers were chosen and trained with the skills for solar system installation.  After the project completion 2 are retained by the company for the Operations and maintenance of the solar farm.  Others were employed by companies involved in solar system construction.  The training has increased the chances of school leavers for employment.

Vendor development programs were also implemented at this solar farm project. Electrical contractors registered with a GLC were and a state government were exposed to the business model for the development and construction of solar  farms.  10 companies benefitted under this program and many more are in the pipeline.

The solar farm has to date received around 1,000 visitors of all types , namely ; 2 Deputy Ministers and their entourage, universities, Asian Development Bank delegates, Delegates from African nations and  community leaders.

The visits by the Deputy Ministers were given wide publicity by the local media and enhanced awareness of the public on the importance of renewable energy projects and that such projects are feasible.

8 MW solar farm

Working visit by the Deputy Minister of International Trade and Industry

8 MW solar farm

Working Visit by the Deputy Minister of Science, Technology  & Innovation          


The Contribution of the Project to the Economic Dimension of Sustainable Development

Overall economic contribution of this project is the catalyst effect of development, mainly from:

  • employment opportunity for locals,
  • income to local government authorities,
  • increase in value of surrounding properties,
  • spurs up development of surrounding properties.

Employment opportunities for locals

The operations and maintenance of the solar farm project requires many types of services from many suppliers and contractors.  The developer/owner requires 8 personnel to fully man the operations.  Cleaning  contractors provide cleaning services for the building and its compound.  Food and Beverage contractors also provide their services whenever the solar farm receives visitors.  Security guard services to maintain safety of the property on a round- the- clock basis.  Also the landscape contractors are hired for the upkeep of trees and grass of the property and the surrounding roads.

Income to Local Government Authorities

Being a newly incorporated Local Council; The Bandar Hijau Hang Tuah Jaya Town Council, Melaka, requires substantial funds to provide sufficient services and infra-structure to the occupants of the township.  This solar farm project alone pays RM54,000 as Assessment Tax and RM63,000 land Tax per annum.

This project also provided the required 2 km access road and parameter roads along with other utilities infra-structure which were then handed over to the local authorities on completion of construction.  These facilities were worth about RM5 million at the time of completion in 2014.

8 MW solar farm

Access road and perimeter road constructed as part of the solar farm project.

8 MW solar farm

Road by the Local authority ends at point 1 km away from the solar farm. The access road was built starting from this spot.

Increase in value of surrounding properties

With the ready infra-structure to the area, property values rose which brings higher income to the Local authorities.  At the beginning of the project in 2012, land value was RM6.00 per sqft.  But at the end of 2014, land value rose to RM24.00 per sq.ft.

Spurs up development of surrounding properties

This solar farm project acts as a catalyst for other land owners to start development of their land.  A traditional village style inn was completed and in operation soon after along with seminar rooms and restaurants.  The National SOCSO  Rehabilitation Centre is also in full operations.  A housing development is also underway; at its land clearing and earthworks stage.

8 MW solar farm

Aerial Photo: showing earthwork in progress for a housing development.

8 MW solar farm

Traditional kampung house for group boarding.

8 MW solar farm

Seminar and restaurant complex


Environmental, Social and Economic Benefits of the Project Beyond the Borders of Malaysia.

The business model of financing and development of Renewable Energy as showcased by this project  has attracted delegates from Africa and the Middle East.  Presentations by owner/developer of the solar farm has opened up the minds of the delegates from various authorities and financial institutions of those countries that Renewable Energy projects are viable  based on this company’s business model.

Many countries in Africa and the Middle East lack electricity supply especially for the rural and suburban areas and power black outs are common.  With the building of solar farms in the rural areas, supplying electricity is made easier and cheaper as transmission cost will be much reduced.  This solar farm project has the capacity to supply electricity top 1,800 households.  This is the targeted size of development for rural and suburban communities and cottage industries in those countries.

8 MW solar farm

Delegation from Africa at the solar farm


The Potential of Being a Model for Replication in Other Countries

The solar farm project is basically an independent power generation plant for a local area distribution of electricity or what is popularly known as mini-grid.  So for an area which is far from existing grid supply, to get connection from existing grid require a high cost for transmission facilities to be built.  A solar farm built in-situ in a new development area will not require transmission of electricity from a distant source which is expensive.

8 MW solar farm

Solar mini grid system which eliminates long distance transmission costs

The understanding and ability of financial institutions to finance  solar farms based on the terms and conditions that were given for this solar farm project can also be replicated which results in a win-win situation for the solar farm developer, the financial institution and the benefitting communities

visit us at Gading Kencana for more information or Prosolar for inquiry

 

 

Blog Comments

Hey there just wanted to give you a quick heads up.
The words in your article seem to be running off the screen in Internet explorer.
I’m not sure if this is a format issue or something to do with internet browser compatibility but I figured I’d post to let you know.
The style and design look great though! Hope you get the problem resolved soon. Cheers

Here is my web-site writing process

Post Reply

Thank you Karry for the tips, appreciate it very much

Post Reply
Leave a Comment
*Please complete all fields correctly